Construction of SILO shelving in the sugar factory pt. 6.
Due to reasons outside our influence a little delay occurred during the assembly of the structure and the construction works are finishing only now.
A large part of the shelving is already cased with sheet metal, only the entries for the installation of the stacker cranes remain.
At present, the stacker cranes are being assembled. At first, the column of the stacker cranes is built from three elements, then the stacker crane is precisely installed by means of cranes.
Of course other works are being carried out at the same time, such as the levelling and welding of the rails, the installation of the conveyors and the building of the supporting structure of the overhead conveyor.
Wednesday, 7 December 2011